Skip to product information
1 of 1

Axel & Co.

Pine Adjusable Long Lead

Pine Adjusable Long Lead

Regular price €50,00 EUR
Regular price Sale price €50,00 EUR
Sale Sold out
Shipping calculated at checkout.
Hardware
Length

Our Adjustable Long Lead is designed to be light, flexible and comfortable in the hand! It is handmade from Biothane. Biothane, a tightly woven plastic material that is easy to clean for and extremely robust and durable.

It gives you the option for hands-free walking by converting to a shoulder leash. 

You can connect either end of the leash to either fixed D-ring for many different combinations (see below)

Size

  • Full length - 205 cm - to give your dog more freedom on long walks
  • Mid-length / cross-body - 155cm - to have your hands free with your dog walking alongside you or
  • Short Length / Double buckle - 120cm - for more control especially on busy sidewalks

Details

  • 100% waterproof, hypoallergenic and does not absorb odors
  • Dirt can be easily removed with a damp cloth
  • The color does not fade, Biothane cannot expand and still becomes softer with use
  • Sizing

    Full length - 205 cm - to give your dog more freedom on long walks

    Mid-length / cross-body - 155cm - to have your hands free with your dog walking alongside you or

    Short Length / Double buckle - 120cm - for more control especially on busy sidewalks

    Material

    Made of BioThane. It is durable, waterproof, hypoallergenic, easy to clean and does not absorb odor.

    The color does not fade, Biothane cannot expand and still becomes softer with use.

    Care Instructions

    Simply wipe it down with a damp towel, a baby wipe, or a sanitizing wipe. This will work great for everyday surface dust and dirt. To do a more thorough clean, fill a bowl with mild soapy water and soak it for a few minutes.

    View full details