Skip to product information
1 of 1

Axel & Co.

Santa Long Lead and Collar Bundle

Santa Long Lead and Collar Bundle

Regular price €68,00 EUR
Regular price Sale price €68,00 EUR
Sale Sold out
Shipping calculated at checkout.
Width of Collar
Size of Collar
Hardware

Our Long Lead and Collar Bundle includes our handmade Adjustable Long Lead and Classic Collar in one!

Our Adjustable Long Lead is designed to be light, flexible and comfortable in the hand! It is handmade from Biothane. Biothane, a tightly woven plastic material that is easy to clean for and extremely robust and durable.

It gives you the option for hands-free walking by converting to a shoulder leash. 

You can connect either end of the leash to either fixed D-ring for many different combinations.

Sizing

Collar Size

X-Small  | 17-25

Small | 25-35cm

Medium  | 35 -40cm

Large  | 40-50cm

Adjustable Leash size

Full length - 205 cm - to give your dog more freedom on long walks

Mid-length / cross-body - 155cm - to have your hands free with your dog walking alongside you or

Short Length / Double buckle - 120cm - for more control especially on busy sidewalks

Material

Made of BioThane. It is durable, waterproof, hypoallergenic, easy to clean and does not absorb odor.

The color does not fade, Biothane cannot expand and still becomes softer with use.

Care Instructions

Simply wipe it down with a damp towel, a baby wipe, or a sanitizing wipe. This will work great for everyday surface dust and dirt. To do a more thorough clean, fill a bowl with mild soapy water and soak it for a few minutes.

View full details