1
/
of
1
Axel & Co.
Berry Multi-Functional Leash and Collar Bundle
Berry Multi-Functional Leash and Collar Bundle
Regular price
€68,00 EUR
Regular price
Sale price
€68,00 EUR
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Share
Our Multi-Functional Leash was designed as an 'All-in-one solution' for your pet walking needs.
The Leash is equipped with a double O-Ring attachment which provides you with the flexibility you to adjust the leash to any length with a quick slide. Length is approx. 220cm
The leash is super versatile and it can be used in multiple ways:
- Classic Leash with Handle
- Hands-free cross body
- Hands-free across the waist
- Use the two Buckles at the ends as a 'Coupler' to walk two dogs
- Or any desired length
Select your desired Collar width and size for a perfect Duo!
Material
Material
Biothane: is a coated polyester webbing
Hardware: Sand Casted Brass or Stainless Steel
Care
Care
Clean with a slightly moist towel or wet wipes.
Use light soap and rinse it with water. Dry with a towel.
Origin
Origin
Handcrafted in Austria
![Berry Multi-Functional Leash and Collar Bundle](http://www.axelco.shop/cdn/shop/files/image_637e67ba-46d2-4862-a60c-56f05c20cbe8.jpg?v=1712685630&width=1445)
![Berry Multi-Functional Leash and Collar Bundle](http://www.axelco.shop/cdn/shop/files/image_0d3caddb-1611-47e7-bf91-72964b710706.jpg?v=1690882832&width=1445)
Collar Sizing
![](https://cdn.shopify.com/s/files/1/0413/9309/4813/files/Beige_Clean_Size_Chart_Instagram_Post_1_1024x1024.png?v=1712156494)