1
/
of
2
Axel & Co.
Fig Multi-Functional Leash
Fig Multi-Functional Leash
Regular price
€50,00 EUR
Regular price
Sale price
€50,00 EUR
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Share
Our Multi-Functional Leash was designed as an 'All-in-one solution' for your pet walking needs.
The Leash is equipped with a double O-Ring attachment which provides you with the flexibility you to adjust the leash to any length with a quick slide. Length is approx. 220cm.
The leash is super versatile and it can be used in multiple ways:
- Classic Leash with Handle
- Hands-free cross body
- Hands-free across the waist
- Use the two Buckles at the ends as a 'Coupler' to walk two dogs
- Or any desired length
![Fig Multi-Functional Leash](http://www.axelco.shop/cdn/shop/files/8A8D06B2-C0D2-4756-9143-B896466AC441.jpg?v=1712685892&width=1445)
![Fig Multi-Functional Leash](http://www.axelco.shop/cdn/shop/files/540250E1-BFB4-45E2-9091-57DBB76D54CF.jpg?v=1712685933&width=1445)